How a tool moves
Seven steps.
Twelve weeks, typically.
Every project follows the same gate system, with a written report at each gate. You always know which stage your mould is in — and what is blocking it.
Kick-off & DFM3D/2D review, parting line, draft, shrinkage, gating concept, quotation lock.
Mould designFull 3D mould design and 2D assembly drawing sent for your approval before steel is cut.
Steel & machiningMaterial from our own Zhejiang steel supply, then CNC, EDM, wire cut, drilling.
Fitting & spottingCore/cavity spotting, cooling circuit pressure test, ejector and slide function check.
T1 trialFirst shot on a matched tonnage press, with a report on defects and corrective actions.
Correction & T2Steel correction, texture, polishing, then a second trial until parts meet the drawing.
Validation & shippingCMM 3D report, FAI, CPK, pre-shipment inspection, export packing.